- Unlimited inspections for the whole crew: no monthly record cap, no cap on photos per inspection, and one price per company, not per user.
- Everything in Spanish for the crew — the points, the PDF report and the signatures — or a bilingual Spanish + English report for the contractor or the inspector.
- Every day it shows which inspection is due on each site and follows every corrective action until it is closed; at month end, the period audit report in one PDF.
Made-up example: Tower B scaffold, 10 points — 2 fail (mid rail missing on level 3 and a cracked plank on level 2), both critical: DO NOT USE until fixed. In the US, each serious violation can mean an OSHA fine of up to $16,550.
Hallazgos y acciones correctivas


What does this plate cost — and what should it sell for?
YouTube video summary with timestamps — in your language, no account
Trading Journal + Prop-Firm Rule Guard
PDF Toolkit — fill, sign, compress and merge PDFs without uploading them
Creator Toolkit for Whop