Proxmox migration deadline calculator: VMware renewal date vs 20% late-renewal penalty

Miss your VMware subscription anniversary and Broadcom adds 20% to the first-year renewal. This calculator shows, for your cluster, whether the move to Proxmox VE finishes before that date, and what the renewal costs if it does not.

Your numbers

Your result

Physical cores in the cluster-
Licensed cores (16-core minimum per CPU)-
VMware subscription per year-
Days the migration needs-
Days short of the renewal date-
Renewal you still owe if the migration overruns-
20% late surcharge if you let it lapse-
VMs per week needed to finish in time-

Everything updates as you type. Nothing is uploaded. This runs in your browser.

· the .xlsx workbook with a Catch-up plan sheet, one-time payment, not a subscription. See your own answer above first.

The rules this uses

16-core minimum per CPU. Broadcom bills the physical cores of every CPU, and never fewer than 16 per CPU (Broadcom KB 313548). Two 12-core CPUs are billed as 32 cores.

20% late-renewal surcharge. If the subscription is not renewed on its anniversary date, Broadcom adds 20% on top of the first year's renewal offer (Techzine, 28 March 2025).

No 72-core minimum. The 72-core order minimum announced for 10 April 2025 was withdrawn the same day; Broadcom kept the 16-core rule (iX / it-daily, 10 April 2025). Many calculators and chatbots still apply 72.

Why a free core calculator is not enough: it multiplies cores by a price, but it never compares your Proxmox VE migration pace with the renewal date. The example price of $135 per core per year is Redress Compliance's list estimate for vSphere Foundation; type the price from your own quote.

Get the full calculatorFull version: all tabs, your own file, works offline.

Open full tool → getreadystack.com · Put this on your site with your logo